Construction of a wind farm comprising of 5 no. turbines with a maximum height of 126.5m to blade tip and 2 no. turbines with a maximum height of 121m to blade tip, control building, anemometer mast and ancillary infrastructure (Daventry District Council, reference DA/2010/0100)