Go to the new North Northamptonshire Council website

Site Specific Part 2 Local Plan

Adopted Kettering Site Specific Part 2 Local Plan

The Kettering Site Specific Part 2 Local Plan was formally adopted at North Northamptonshire's Full Council meeting on 1 December 2021.  The plan and supporting documents are available here:

Examination into the Kettering Site Specific Part 2 Local Plan

The SSP2 was submitted to the Secretary of State on 28 May 2020 for examination by a Planning Inspector. Hearing sessions took place in October 2020 and a consultation on Main Modifications took place from 19 March to 30 April 2021. The Inspector’s Report was received on 2 July 2021. The Report concluded that with the Inspector’s recommended Main Modifications the Site Specific Part 2 Local Plan is ‘sound’.

Information about the examination process can be accessed from the Council’s Local Plan Examination web page:

Kettering Site Specific Part 2 Local Plan

The Kettering Site Specific Part 2 Local Plan develops in more detail the strategy outlined in the North Northamptonshire Joint Core Strategy (JCS) which is the strategic Part 1 Local Plan.  The Kettering Site Specific Part 2 Local Plan allocates non-strategic sites to meet requirements in the JCS and provides detailed local policies for the Kettering area (formerly Kettering Borough)